SKAGIT COUNTY, WA (MyBellinghamNow.com) – There will be delays all week long if you’re traveling on Highway 20 this week.

At Ranger Station Rd and the Cascade River Road Bridge (MP 105) traffic will alternate for utility work from 6 a.m. to 8 p.m. and flaggers will alternate traffic through a single lane at Hornbeck Lane (MP 94) between 7 a.m. and 5:30 p.m. for fish passage work there. On Highway 20 near Diablo Street (MP 125), flaggers will alternate through a single lane from 7 a.m. to 4 p.m. for emergency repairs as a result of the Sourdough Wildfires.

All that work is scheduled to run through Friday, March 29.

In addition, on Saturday, March 30, both directions of State Route 534 near Conway Hill Road will fully close from 9 a.m. to 1 p.m. for the ongoing Olympic Pipeline clean up. A signed detour will be in place and Olympic pipeline responders and crews will be active in the area.